Tung Chung

Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities

Leighton-Chun Wo Joint Venture

January-2017

Hung Hom

Remove the sludge and marine growths slim for the sea water intake tunnel

Hip Hing Construction Group

September to October-2016

Admiralty

Inspection and clear of pump house intake

China Overseas Property Services Ltd.

July-2016

Hung Hom

Remove the sludge and marine growths slim for the sea water intake tunnel

Hip Hing Construction Group

July-2016

Wanchai

CCTV inspection of the sinking ship

China Harbour Engineering Co. Ltd.

June-2016

Hung Hom

Underwater Concreting and grouting

Tung Yat Construction Co. Ltd

April-2016

Kwai Chung

Remove fender wood of Container Terminals

Smooth Contracting Ltd.

April-2016

Hung Hom

Remove of the bulk head inside the box-culvert

Tung Yat Construction Co. Ltd

February -2016

Hung Hom

Bulkhead Design and Installation

Tung Yat Construction Co. Ltd

January -2016

Hung Hom

Inspection and photo of pump house intake

Hip Hing Construction Group

January -2016

Hung Hom

Supply daywork confined space diving team.

Tung Yat Construction Co. Ltd

January -2016

Tuen Mun
Western

Supply 3 temporary steel frame and installation of 3 steel plates for the invert chambers

Jardine Engineering Corporation, Limited

August to November-2015

Hung Hom

Inspection and photo of pump house intake

Hip Hing Construction Group

June-2015

Tuen Mun
Western

Diving Works for Stop log Installation at Flow Control Chamber A

Jardine Engineering Corporation, Limited

May-2015

Tuen Mun
Western

1) Diving Works for Stop log Installation at Flow Control Chamber B

Jardine Engineering Corporation, Limited

March to April 2015

2) Diving Works for Stop log Installation at Flow Control Chamber A

Jardine Engineering Corporation, Limited

November to December 2014

Cheung
Chau  

1) Underwater cutting 955Ømm pipe line ring bit

China Road-China Pipeline Joint Venture

September to October 2014

2) Underwater Concreting and grouting

China Road-China Pipeline Joint Venture

September to October 2014

Tsing Yi

Bulkhead Design and Installation

Hip Hing Construction Group

August-2014


Wanchai

Remove fender wood of heliport

Chun Wo - CRGL Joint Venture

May to June 2014

Wanchai

Underwater cutting and welding

Chun Wo - CRGL Joint Venture

Mar-2014

Wanchai

CCTV inspection of the 600Ømm pipe line

Chun Wo - CRGL Joint Venture

February -2014

Austin  

Remove of the bulk head inside the box-culvert

Vibro (HK) LTD.

January - 2014

Central

Remove of the bulk head inside the box-culvert

Leighton

December -2013

Wanchai

Inspection and photo of pump house intake

Chun Wo - CRGL Joint Venture

November -2013

Wanchai

Inspection and photo of bulk head the box culvert

Chun Wo - CRGL Joint Venture

October -2013

Macau

Underwater cutting 2.5mØ bored-piles

三和

October -2013

Wanchai

Underwater cutting and welding

Chun Wo - CRGL Joint Venture

September -2013

Wanchai

Remove fender wood of heliport

Chun Wo - CRGL Joint Venture

August to September  2013

Wanchai  

1) Cleaning N1 intake Bay 4, underwater cutting and welding,

Chun Wo - CRGL Joint Venture

July to August 2013

2) Underwater Concreting and grouting

Chun Wo - CRGL Joint Venture

July to August 2013

Wanchai

Remove fender wood of heliport

Chun Wo - CRGL Joint Venture

May to July 2013

Wanchai

Underwater concreting and grouting intake  

Chun Wo - CRGL Joint Venture

April-2013

Austin
Station

Bulkhead Design and Installation

Vibro (HK) LTD.

March to April 2013

Wanchai

1) Cleaning Bay 1 intake, underwater cutting and welding,

Chun Wo - CRGL Joint Venture

January to March 2013

2) Underwater Concreting and grouting

Chun Wo - CRGL Joint Venture

January to March 2013

Sheung Wan

Bulkhead Design and Installation

Sun Fook Kong

December -2012

Wanchai

Repair pump house intake and outtake

Chun Wo - CRGL Joint Venture

November -2012

Copyright (C) 2018 Seven Seas Diving Contractors(HK) Ltd. Web Designed by Newsbook Ltd